PROJECTS

    Austrak has provided railway sleepers, turnout bearers and other products for a range of clients for their use in a variety of applications.

    Queensland Rail

    Austrak’s association with Queensland Rail started in 1983, producing more than 5.5 million sleepers over this time from three factories. Austrak has been QR's sole supplier of concrete ties during this period.

    The most recent contract is a new "open book alliance" style 5+5 year contract awarded in April 2006. We have also supplied QR with more than 1250 turnout bearers since 1984.

    click here to download the project sheet

    Regional Fast Rail – Victoria

    The Victorian Government (through its Department of Infrastructure) undertook to upgrade key country rail lines feeding Melbourne (Geelong, Ballarat, Bendigo and La Trobe Valley). The railway construction work was awarded to two contractors, TAJV and RRL. These contractors, in turn, awarded design and supply of the sleepers to Austrak of 191,000 and 248,000 sleepers respectively. Sleepers were manufactured in 2003 to 2004.

    click here to download the project sheet

    Alice Springs to Darwin Railway – ADrail NT

    In 2001 ADrail contracted Austrak to design and supply about two million standard gauge sleepers for this new 1420km single track railway. The sleepers had to be manufactured in 16 months. The railway was to be constructed in some of the most remote and inhospitable parts of Australia.

    click here to download the project sheet

    National Rail Corporation – Victoria

    Austrak was contracted in 1984 by National Rail Corporation to provide 280,000 standard gauge sleepers for the project, which was funded by the Commonwealth Government's "One Nation" program, to convert the broad gauge line between Melbourne and Adelaide to standard gauge.

    This was the final standard gauge link between all Australian capital cities and opened for traffic in June 1995.

    click here to download the project sheet

    Fortescue Metals Group – Pilbara, WA

    In 2007/08 Austrak produced 260km of heavy haul sleepers for FMG to connect their new port facilities at Port Hedland to their iron ore mine sites.

    click here to download the project sheet

    Mainline Upgrade Project – ARTC Vic and NSW

    In 2006 ARTC contracted Austrak to supply 1.25 million standard gauge mainline sleepers and 22,350 dual standard/broad gauge with a contract value in excess of $100 million. Delivery between March 2007 and April 2009. The contract was completed one month ahead of schedule. In February 2009 ARTC negotiated an extension of 560,000 sleepers.

    In 2007 Vossloh Cogifer awarded Austrak about 140 turnout bearer sets valued at over $3 million to supply to ARTC for this project.

    click here to download the project sheet

    Rio Tinto Iron Ore Projects – Pilbara WA

    Austrak has supplied sleepers and turnouts to Rio Tinto since 1987 to present for various projects.

    click here to download the project sheet

    BHP Billiton Iron Ore – Pilbara WA

    Austrak was initially contracted to supply sleepers for BHP's Iron Ore projects in 1986 and to date has supplied more than 700,000 sleepers and about 100 turnout bearer sets. The sleepers were for the partial duplication of the line to Mt Newman, Yandi, Whaleback and Jimblebar.

    click here to download the project sheet

    Rapid Factory Deployment

    Of 12 factories constructed to date one was in South-East Asia, five in remote locations in Australia and five were adjacent to small country towns, again in Australia. Austrak has a reputation for servicing locations that are remote to help the client achieve best-delivered cost of the sleeper.

    click here to download the project sheet

    Miscellaneous Small Sleeper Orders

    Austrak’s Geelong factory mostly services smaller design/manufacture orders (orders from 50 up to about 50,000 sleepers). Clients include the ARTC, Fluor Australia, John Holland, Laing O’Rourke, Leighton Contractors, Mainco, Pacific National, Public Transport Corporation Victoria, Queensland Rail, Rail Infrastructure Corporation NSW, Theiss, TransAdelaide, Transfield Services, United Group, VicTrack, Warkworth Mining and Yarra Trams. Products produced include Tram sleepers, Standard gauge, Broad gauge, Dual gauge, Gauge convertible and Special sleepers.

    click here to download the project sheet

    West Angelas Mine – Pilbara WA

    Austrak was awarded the contract to manufacture 560,000 sleepers over 18 months during 2000/2001 for the new West Angelas mine in the Pilbara. The scope of the project was reduced during its later stages when the owner, Norths Ltd, was taken over by Rio Tinto.

    click here to download the project sheet

    Media Panel
    Prev Next
    • Alice Springs to Darwin Railway