|
>> FACTORIES - MANUFACTURING PROCESS

> 7. Inspect, Test and Install
The sleepers are now visually inspected, with a predetermined number of sleepers set aside for full dimensional checks and static load testing. Where required, loose fastenings are now installed and locked into position.

|